Demolition of beach road greenhouse complex
Sunday 16 May 2021
| Project | Demolition of beach road greenhouse complex |
| Location | ’s-Gravenzande |
| The Inquiry | Remove everything and re-sow grass |
What have we done
Removed the inside, cover off, facades out, and iron the rest. Everything sorted neatly and business for a second life are sold there the rest is recycled.
Timeframe
5 weeks with between poses because there was no rush
Additional work
No additional work, but a repair to former stick space and repair to the asphalt due to damage from a truck
Success factor
Satisfied customer
![]()